AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

National Engineering Services Pakistan (NESPAK) Private Limited has won project design, construction supervision and implementation support of the ADB-funded Balochistan Water Resources Development Sector Project (BWRDSP) through national competitive bidding; this was stated by Dr. Tahir Masood, Managing Director NESPAK here on Wednesday.

The project will support implementation of integrated water resources management policy of the Government of Balochistan. The policy provides a comprehensive framework for the province to address the issues of water management and development in the context of basin approach, with water harvesting, and groundwater recharging as an integral part of watershed management. The proposed project will address the issues of water management and will enhance agricultural production by construction of a dam (Siri Toi Dam) and rehabilitation/extension of 10 irrigation schemes in Zhob and Mula river basins.

The proposed project will construct and improve irrigation land of about 16,592 hectares and benefit about 42,900 farmers in the Balochistan province. The duration of the project is five years.

Meanwhile, a NESPAK-8.2 OZI JV was awarded NTDC's contract for "Solar Water Pumping in Balochistan - A Feasibility Study." As an initiative towards energy and agricultural sectors reforms in Balochistan, NTDC on behalf of Ministry of Energy (Power Division) has entrusted NESPAK led JV with the task to conduct a comprehensive feasibility study for Solarization of 10,000 tube wells located in various Districts of Balochistan. The 5-month study will encompass a number of issues related to Balochistan endangering the sustainability of its eco-system.

Copyright Business Recorder, 2019

Comments

Comments are closed.