AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)
Pakistan

Pakistan’s only wet-process cement plant on the brink of shutdown

Established in 1956-57 in Sindh, Zeal Pak Cement Factory Ltd operates on wet-process technology. The wet-proce
Published January 15, 2020
  • Established in 1956-57 in Sindh, Zeal Pak Cement Factory Ltd operates on wet-process technology.
  • The wet-process technology has been declared out dated throughout the world.

Zeal Pak Cement Factory Ltd, the country's sole wet-process plant, is running on continuous loss as the company is unable to compete with more modern production facilities.

The company was established in 1956-57 in Sindh, which operates on wet-process technology that has been declared out dated throughout the world, informed Masood ul Hassan, group general manager of the company, in a filing to the Pakistan Stock Exchange (PSX).

“In wet process technology, the fuel is consumed more than double and the cost of manufacturing of cement doubled as compare to compared to dry process technology,” the statement said. Masood added that the management is running the factory at a continuous loss and only for its survival to provide employment. The company is facing a huge financial crisis.

The company informed the stock exchange that under these circumstances the survival of the company has become very difficult, adding that the management is considering adopting voluntary delisting of the company.

Comments

Comments are closed.