AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)
Pakistan

Wind power plant of 200 MW to be installed in Sindh: Omar Ayub

Omar Ayub said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage.
Published February 7, 2020
  • Omar Ayub said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage. Had it given the right of way timely,
  • NEPRA has already taken action against the K-Electric and the people of Karachi have elected the PTI, he said, Prime Minister Imran Khan fully support the genuine demands of people of Karachi.

KARACHI: Federal Minister for Energy Omar Ayub Khan said that electricity load shedding has already been ended at around 80 per cent feeders in the country and action would be continued against electricity thieves.

He said in a chat with newsmen after attending a reception hosted in his honor at the residence of Pakistan Tehreek-e-Insaf (PTI) Vice President and parliamentary party leader in Sindh Assembly Haleem Adil Sheikh here, said a statement on Friday.

Omar Ayub said that a wind power plant of 200 megawatts would be installed in Sindh.

Special Assistant of Prime Minister on Petroleum Nadeem Baber also accompanied the Federal Minister.

Omar Ayub said that the Sindh government, itself, is responsible for the gas shortage.

He said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage. Had it given the right of way timely, the gas pressure problems would not have been faced, he added.

He said that it was totally wrong that the gas share of Sindh is being given to other provinces.

The federal minister said that we have started the process of digging up wells to discover gas.

He said that the PTI government overcome the load shedding problem during last Ramzan.

Omar Ayub said that projects to generate expensive electricity were installed during the tenures of previous governments and resultantly the tariff of electricity increased. Present government is closing down these costly projects, he added.

He said that the vision of Prime Minister is to give basic facilities to people.

NEPRA has already taken action against the K-Electric and the people of Karachi have elected the PTI, he said, Prime Minister Imran Khan fully support the genuine demands of people of Karachi.

Speaking on the occasion, Haleem Adil Sheikh said that it is in correct that gas share of Sindh is given to other provinces.

He said that our Energy Ministry is working in an efficient manner. Omar Ayub belongs to a great family and we are grateful to him for his visit.

 

Comments

Comments are closed.