AIRLINK 173.68 Decreased By ▼ -2.21 (-1.26%)
BOP 10.82 Decreased By ▼ -0.16 (-1.46%)
CNERGY 8.26 Increased By ▲ 0.26 (3.25%)
FCCL 46.41 Increased By ▲ 0.29 (0.63%)
FFL 16.14 Increased By ▲ 0.07 (0.44%)
FLYNG 27.80 Increased By ▲ 0.38 (1.39%)
HUBC 146.32 Increased By ▲ 2.36 (1.64%)
HUMNL 13.40 Increased By ▲ 0.05 (0.37%)
KEL 4.39 Decreased By ▼ -0.11 (-2.44%)
KOSM 5.93 Decreased By ▼ -0.05 (-0.84%)
MLCF 59.66 Increased By ▲ 0.16 (0.27%)
OGDC 232.73 Decreased By ▼ -0.02 (-0.01%)
PACE 5.80 Decreased By ▼ -0.08 (-1.36%)
PAEL 47.98 Increased By ▲ 0.50 (1.05%)
PIAHCLA 17.75 Decreased By ▼ -0.22 (-1.22%)
PIBTL 10.40 Decreased By ▼ -0.18 (-1.7%)
POWER 11.32 Decreased By ▼ -0.06 (-0.53%)
PPL 191.48 Decreased By ▼ -1.82 (-0.94%)
PRL 36.83 Decreased By ▼ -0.17 (-0.46%)
PTC 23.20 Decreased By ▼ -0.57 (-2.4%)
SEARL 98.76 Decreased By ▼ -1.11 (-1.11%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.62 Decreased By ▼ -0.57 (-1.53%)
SYM 14.70 Decreased By ▼ -0.25 (-1.67%)
TELE 7.73 Decreased By ▼ -0.02 (-0.26%)
TPLP 10.75 Decreased By ▼ -0.12 (-1.1%)
TRG 66.01 Increased By ▲ 0.87 (1.34%)
WAVESAPP 10.82 Decreased By ▼ -0.09 (-0.82%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
YOUW 3.79 Decreased By ▼ -0.02 (-0.52%)
AIRLINK 173.68 Decreased By ▼ -2.21 (-1.26%)
BOP 10.82 Decreased By ▼ -0.16 (-1.46%)
CNERGY 8.26 Increased By ▲ 0.26 (3.25%)
FCCL 46.41 Increased By ▲ 0.29 (0.63%)
FFL 16.14 Increased By ▲ 0.07 (0.44%)
FLYNG 27.80 Increased By ▲ 0.38 (1.39%)
HUBC 146.32 Increased By ▲ 2.36 (1.64%)
HUMNL 13.40 Increased By ▲ 0.05 (0.37%)
KEL 4.39 Decreased By ▼ -0.11 (-2.44%)
KOSM 5.93 Decreased By ▼ -0.05 (-0.84%)
MLCF 59.66 Increased By ▲ 0.16 (0.27%)
OGDC 232.73 Decreased By ▼ -0.02 (-0.01%)
PACE 5.80 Decreased By ▼ -0.08 (-1.36%)
PAEL 47.98 Increased By ▲ 0.50 (1.05%)
PIAHCLA 17.75 Decreased By ▼ -0.22 (-1.22%)
PIBTL 10.40 Decreased By ▼ -0.18 (-1.7%)
POWER 11.32 Decreased By ▼ -0.06 (-0.53%)
PPL 191.48 Decreased By ▼ -1.82 (-0.94%)
PRL 36.83 Decreased By ▼ -0.17 (-0.46%)
PTC 23.20 Decreased By ▼ -0.57 (-2.4%)
SEARL 98.76 Decreased By ▼ -1.11 (-1.11%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.62 Decreased By ▼ -0.57 (-1.53%)
SYM 14.70 Decreased By ▼ -0.25 (-1.67%)
TELE 7.73 Decreased By ▼ -0.02 (-0.26%)
TPLP 10.75 Decreased By ▼ -0.12 (-1.1%)
TRG 66.01 Increased By ▲ 0.87 (1.34%)
WAVESAPP 10.82 Decreased By ▼ -0.09 (-0.82%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
YOUW 3.79 Decreased By ▼ -0.02 (-0.52%)
BR100 12,644 Increased By 35.1 (0.28%)
BR30 39,387 Increased By 124.3 (0.32%)
KSE100 117,807 Increased By 34.4 (0.03%)
KSE30 36,347 Increased By 50.4 (0.14%)
Pakistan

Peshawar BRT-only third generation bus project, says Yousafzai

As per the approved PC-I, Yousafzai said the cost of the Peshawar BRT was Rs 66.437billion, while the cost of the c
Published February 9, 2020
  • As per the approved PC-I, Yousafzai said the cost of the Peshawar BRT was Rs 66.437billion, while the cost of the corridor construction was Rs 28 billion which translated it into Rs 1.04 billion  per kilometer (km).
  • The total Project cost included various new features which did not own by the other BRTs in the country, he added.

ISLAMABAD: Khyber Pakhtunkhwa Minister for Information Shaukat Ali Yousafzai has said that the Peshawar Bus Rapid Transit (BRT) was the only third generation bus project across the country.

“All other BRTs in Pakistan are of the second generation,” he said in a statement issued here on Sunday.

As per the approved PC-I, he said the cost of the Peshawar BRT was Rs 66.437billion, while the cost of the corridor construction was Rs 28 billion which translated it into Rs 1.04 billion  per kilometer (km).

The total Project cost included various new features which did not own by the other BRTs in the country, he added.

He said the features of Peshawar BRT included construction of 27km main corridor (13km elevated, 11km at grade and 3km underground section), 31 modern stations and development of seven feeder routes (68km) with 154 bus stops. The project also included bus fleet , procured in project budget, façade to façade development throughout the entire corridor, cycle track and pedestrian path construction along the full corridor and universal accessibility throughout in the stations, the minister added.

Three state-of-the-art bus depots construction with development of commercial facilities to generate revenue for the project, construction of underground shops and commercial plazas, construction of Park and Ride and KPUMA Building, compensation to LARP, ITS and Cycle Sharing and Bus Restructuring Programme were also among the other features owned by the Peshawar BRT.

 

Comments

Comments are closed.