AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

Federal Minister for Aviation Ghulam Sarwar Khan, along with Balochistan Chief Minister Jam Kamal Khan, Wednesday inaugurated a newly built international terminal at the Quetta Airport. The minister also performed groundbreaking for construction of a mega runway at the airport for operations of Boeing-777 aircraft.

Addressing the inaugural ceremony, he said airports were considered as vital 'economic & strategic' assets, and the federal government was taking all possible measures for progress and prosperity of the Balochistan province, an Aviation Division press release said. The importance of airports in terms of global connectivity has enhanced the requirement of aviation infrastructure. "Therefore this government has placed aviation sector on its top priority to ensure regional connectivity and bring direct economic benefits to the Quetta airport, which handles about 500,000 passengers annually," he said.

Currently, the Aviation Minister said as many as 38 flights were coming to Quetta Airport on weekly basis. Pakistan Civil Aviation Authority, he said, envisaged expansion of Quetta Airport and started construction in 2016. Phase-I of the project was completed in May 2018, which contained domestic terminal only.

Sarwar said, after taking charge of the Aviation Division, he put phase-II of project on top priority and gave clear instructions for its completion expeditiously.

Under the project, the terminal area had been increased from 73,000 square feet (sq ft) to 200,000 sq ft providing spacious areas for smooth passenger flow. The check-in counters have been increased from 3 to 12 and immigration counters from eight to 26.

The number of baggage belts and seating capacity has surged manifold. In addition to above, a new facility of state lounge for heads of state and dignitaries have been added.

The minister said under the project, "We have increased the passenger handling capacity to 1.6 million passengers per annum." He said the new runway would enable wide body aircraft to land at the Quetta Airport and connect the province with other parts of the world.

Copyright Associated Press of Pakistan, 2020

Comments

Comments are closed.