AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

The National Highways Authority (NHA) Executive Board has recommended "PC-1 for construction of Naukundi-Mashkel Road (103 kms) Taftan-Quetta Road project" at a rationalized cost of Rs8.85 billion for approval of the Central Development Working Party (CDWP).

According to official documents, Captain Sikander Qayyum (Retired), chairman, NHA presided over the executive board meeting.

The board recommended "PC-1 for construction of Naukundi-Mashkel Road (103 kms) Taftan-Quetta Road Project" as deposit work at a rationalised cost of Rs8.85b by excluding the NHA establishment charges at the rate of one percent of the project cost, having an economic internal rate

of return (EIRR) of 9.20 percent for approval of the CDWP.

The board also recommended the PC-I for construction of new bridge on River Chenab between Shujaabad and Khangarh project at a cost of Rs.9.56 billion as deposit work of Government of the Punjab having an EIRR of 17.35 percent for approval of the CDWP.

The board constituted a committee comprising chief (NTRC) and GM (RAMD) NHA to conduct a study for developing a tolling model for determination and revision of per km toll rates on various highways, motorways and expressways.

The committee will be responsible to submit its report/recommendations within 15 days to the board.

The board directed to make amendments in the NHA code to cover toll rates on motorways.

The board further directed to submit revised estimates 2019-2020 by the end of May, 2020 whereas, budget estimates of 2020-2021 should be presented preferably before June 30, 2020.