Rental power plants: ECC decision puts Ministry in a difficult position
The Economic Co-ordination Committee (ECC) of the cabinet has put the Ministry of Water and Power in a difficult position, with regard to selection of 1500 MW Rental Power Plants (RPPs) out of the 14 plants having total capacity of 2250 MW, well-informed