Reactivating Neelum-Jhelum hydropower project: PM orders formation of body on urgent basis ISLAMABAD: The closure of Neelum-Jhelum Hydropower Project is causing a loss of millions of rupees to the national... Published 15 Jul, 2024 06:25am
Editorials Neelum-Jehlum breakdown, again EDITORIAL: The prime minister will have to do a lot more than order an inquiry into the latest “technical fault” at... Published 26 May, 2024 02:56am
Markets NJHP to resume power generation by end-month LAHORE: The 969 MW Neelum-Jhelum Hydropower Project is all set to resume electricity generation by the end of this... Published 16 Jul, 2023 06:16am
Markets NJHP tunnel being rebuilt LAHORE: A significant development at the blockade in tail race tunnel of 969-MW Neelum Jhelum Hydropower Project... Published 25 Apr, 2023 06:25am
Print NJHP rehabilitation: Govt likely to set aside PPRA rules ISLAMABAD: The Government is likely to set aside PPRA Rules 42(c) and allow WAPDA to opt for direct contracting for... Updated 01 Aug, 2022 09:47am